Customization: | Available |
---|---|
Volume: | 10001 - 15000L |
Certification: | ISO9000, CCC, TS16949, EPA, EEC, RoHS, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Factory Price Fvr 4X2 6 Wheel 241 HP Water Sprinkler Truck | ||
Vehicle Parameters | Vehicle Model: | QL1180XMFRY |
Overall Dimension(L x W x H): | 8200x2500x2947mm | |
Curb Weight: | 5500Kg | |
GVW: | 18000Kg | |
Wheelbase: | 4500mm | |
Drive Type: | 4x2 | |
Engine | Engine Model: | 6HK1-TCL |
Engine Power: | 177Kw | |
Delivery Capacity: | 7790ml | |
Horsepower: | 241Ps | |
Emission standard | Euro5 | |
Transmission | Transmission: | MLD-6Q |
Forword Gear: | 6 Speed Gear | |
Backward Gear: | 1 Speed Gear | |
Seats | Front Seat: | 3 |
Chassis | Front Wheel Distance: | 1960mm |
Rear Wheel Distance: | 1855mm | |
Axle Loads: | Double Axles | |
Tires: | 7 | |
Tire Model: | 11R20 | |
Configuration: | Power Steering, AC, Retro-reflective Marking, ABS, Free Maintenance Battery, Data Recorder |
Capacity: | 12000L +3~5%. |
Compartments: | One compartment |
Shape of tank: | Ellipse, double "D". |
Tank material: | Carbon steel, the thickness of the shell is 4mm nominal ; |
Dish ends and bulkhead material: | Carbon steel, dished and flanged; |
Painting: | Outer surface paint. Color according to the customer's requirement. |
Test pressure designed: | 36kpa. |
Manhole: | Two 20" diameter manholes. |
Bottom loading system: | One 3" stainless steel pipe line Pipe line outlet is lies at right side of tank, located in the front of rear axle. Each pipe line outlet, a 3" stainless ball valve is fixed. |
Measurement ruler: | NIL |
Vapour Vent: | NIL. |
Vapour Recovery Piping: |
NIL |
Vapour Recovery Adaptor: | NIL |
Overfill Prevention: | NIL |
Ladder: | A detachable Carbon steel ladder is equipped at the front of the tank |
Walkway: | Anti-skid walk way along the entire length of tank. |
Handrail: | NIL. |
Hose carriers: | Two pcs. Carbon steel |
Hose: | Two pcs. 3"x4m, 3" carbon steel female camlock coupling on both end. |
Pump: | Stainless steel material, driven by PTO |
Fire extinguisher box: | Two boxes are fixed on the left and right side of the tank. |
Fire extinguisher: | Two 4kg dry powder fire extinguisher. |
Fender: | Plastic material mudguards with plastic flap. |
Tool Box: | Supplied by CIMC |
Drain pipe; | Mild Steel |
other: | One earthing reel. |
Side guard: | Both. Manufacture's standard design |
Rear bumper: | Manufacture's standard design |